There is no useful single price for an interior project without a defined scope. Two apartments of the same size can need very different amounts of work. One may require furniture and lighting, while another needs extensive changes before finishes can begin. A budget becomes more reliable when it explains what you are buying, what is excluded and which decisions are still open.
Download the budget worksheet (CSV)A blank template for your own quantities, quotes, allowances and exclusions.
Before you begin
- Compare the same scope and specifications before comparing totals.
- Include separately purchased items in the overall budget.
- Record allowances and approve variations before additional work.
Begin with the work, not a square-foot rate
List the rooms and the outcome required in each. Separate retained items from new work. In a living room, for example, the brief might retain the floor and sofa but add storage, curtains and a revised lighting arrangement. A kitchen may involve a different combination of cabinetry, surfaces, appliances and specialist work.
Ask what any quoted area-based rate actually covers. Does it apply to the whole property or only the treated area? Does it include loose furniture or only fixed work? Without these answers, comparing rates can make unlike proposals appear equivalent. A project-specific scope is more useful than an attractive number without a definition.
Divide the budget into understandable groups
Create separate lines for design services, site preparation, fixed interiors, specialist services, loose furniture, lighting, textiles, delivery and installation. Include building-related charges that apply to your project. Some groups may be outside the designer's contract, but they still belong in your overall spending plan.
Record who supplies each item. If you buy appliances directly, their cost should not disappear from the household budget simply because it is absent from the contractor's quotation. Keep a single worksheet covering both contracted and separately purchased items so you can see the actual commitment.
Ask for quantities and specifications
A cabinet quotation should describe more than its appearance. Ask about dimensions, construction, finish, hardware and installation. For flooring or wall work, check the measured quantity, preparation and finishing. Compare proposals using the same agreed information where possible.
If a material is not selected, ask whether the amount is an allowance and what happens when the final product is chosen. A low allowance can make the initial total look appealing while leaving major decisions unresolved. Write down the exact assumption beside the amount. This lets you identify which parts of the total are firm and which may change.
Keep a decision register
For every unresolved item, note the choice, the person responsible and the point at which a decision is needed. Distinguish essential work from optional upgrades. That makes it easier to reduce scope deliberately if the proposal exceeds your budget, rather than replacing visible materials at random.
For example, retaining an existing floor may be worth exploring before reducing the quality of every cabinet fitting. The right trade-off depends on the condition and function of the items involved. Ask the team to explain the consequences of each option for the layout, upkeep and sequence of work. Avoid treating a reduction as equivalent when it changes what the project delivers.
Allow for uncertainty without inventing precision
Existing conditions may only become clear after inspection or opening up agreed areas. Discuss how those findings will be assessed and priced. Set aside a project-specific contingency with your team; the appropriate amount depends on the level of uncertainty and should not be guessed from a universal percentage.
Agree a variation procedure before work starts. A written change should describe the revised work, cost effect and any effect on the schedule, with approval recorded before proceeding. Keep invoices and decisions in the same project folder. A clear paper trail makes later conversations much easier than reconstructing decisions from scattered messages.
Use a quotation review checklist
Check that the proposal identifies the property, the drawing or scope version, included work, exclusions, payment stages and how variations are handled. Ask who coordinates the trades and who resolves defects. Review terms with appropriate advice where needed rather than assuming an informal description settles every obligation.
For a Chittagong or Cox’s Bazar enquiry, give Modish Makers your priorities and an honest spending range. The team can then discuss scope and options that are relevant to you. This article does not publish a market rate because a responsible estimate needs a brief, site information and an agreed specification.