Renovation is a sequence of decisions, not just a list of finishes. Before new work starts, the team needs to understand what exists, what can stay and what requires further investigation. In an occupied apartment building, access, neighbours and shared services also affect the plan. A written checklist helps keep those discussions visible from the first visit to handover.
Before you begin
- Record existing conditions and building restrictions before work.
- Keep a single approved drawing set and written change register.
- Use a room-by-room handover list, including care and maintenance information.
Record the existing condition
Photograph each room, including corners, windows, ceilings and areas behind large furniture where access is possible. Note cracks, leaks, stains, loose finishes and items that do not operate properly. Keep this record as information for the project team rather than trying to diagnose every cause yourself.
Ask appropriately qualified professionals to assess structural or service-related concerns. A decorative contractor should not decide independently that an element can be removed. Where existing dampness is present, establish the source before approving new finishes. EPA guidance also warns against painting over mouldy surfaces without resolving the problem and preparing them appropriately.
Confirm the building arrangements
Speak to building management about permitted work, lift bookings, delivery routes, noise restrictions and waste removal. Clarify approvals for work affecting common areas or shared services. Keep the relevant contact details with the project brief. Ask how neighbours will be notified of agreed disruptive work.
Check where materials can be stored and which routes must remain accessible. Large boards, furniture and appliances may need a delivery plan. Record restrictions before the team finalises the work sequence. Do not assume that access available during a casual visit will be available for every delivery or stage of construction.
Decide how the household will live during work
If you will remain in the apartment, identify which rooms and essential facilities must stay usable. Discuss temporary separation, cleaning and access with the contractor. Some activities may require you to be elsewhere; have that conversation before the work begins rather than in response to a disruption.
Pack and label items that must be protected or moved. Separate valuables and sensitive documents from the working area. Confirm who moves heavy furniture and whether that work is included. A clear arrangement for occupied rooms helps the design team sequence tasks around the household's actual needs.
Coordinate the drawings before site work
Review the layout, fixed furniture, lighting and service requirements together. A cabinet should not be installed in isolation from the power points or fittings it is intended to serve. Ask which drawings are approved for use and how updated versions reach the people carrying out the work.
Do not treat the most recent image in a message thread as a complete instruction. Keep an approved drawing set and a written register of changes. When a site condition requires a decision, ask the responsible professional to explain the options and any cost or schedule consequences. Record the agreed answer before the affected work proceeds.
Inspect work while it can still be seen
Agree review points with the project team. Some details are easier to check before they are concealed by finishes or fitted furniture. Ask the relevant trades what should be inspected and documented at each stage. Keep dated photographs and sign-offs where appropriate to the work.
For visible finishes, compare installation against the approved sample and specification. Raise concerns promptly and identify the location clearly. A description such as the left cabinet beside the kitchen entrance is easier to act on than a general complaint about finishing. Keep the resolution in the same decision log.
Prepare a deliberate handover
Walk through the property with the team and make a room-by-room list of unfinished or defective items. Check the operation of agreed fittings and collect manufacturer information, care instructions and relevant warranties. Confirm responsibility and next steps for every item that remains open.
A renovation is not complete simply because furniture has arrived for photographs. The useful endpoint is a space you understand how to use and maintain, with the agreed work accounted for. Bring the condition record, building restrictions and occupancy plan to Modish Makers when discussing a Chittagong renovation so these practical issues enter the brief early.